Total build time: 493 hours.
Finally, time to skin the right wing! The same method as the left wing was used, and there were no surprises.
Again I ran conduit for wingtip lighting wires if I so desired, as well as the pitot/static lines.
Then on goes the leading edge skin.
THE WINGS ARE DONE!! =D
From start to finish they took me 276 hours of work over a 66 day period. This includes wing spars, flaps/ailerons, pitot tube/LRI installations, and the wing rack.
Now what?!?!?