Monthly Archives: June 2014
Forward Fuselage #9 (Seat Installation)
Total Build Time: 661 Hours. Finally, the seat installation… a fabrication and assembly process that I’ve both been dreading and looking forward to, for quite some time. Dreading because it involves large accurate bends in aluminum sheet metal that I have not performed before (and is typically done on a proper bending brake, which I … Continue reading
Categories: Forward Fuselage, Waiex #197
3 Comments
Forward Fuselage #8 (Flap detent, elevator push-rod cover)
Total build time: 646 Hours. Two more small details in the cockpit before I get to completing the seat installation. First is installing a protective cover for the elevator pushrod that eventually will go from the control sticks, down the center of the bottom of the seat, back to the idler bellcrank. A few cuts in the pre-bent cover … Continue reading
Categories: Forward Fuselage, Waiex #197
3 Comments