Hangar Completion #2: (Engine Baffles)

Total Build Time: 1130 Hours. The engine baffles took me far more time to complete than I expected (about 30 hours.) My primary concern when installing the baffles was to get a very tight seal between baffles and cowling in order to maximize cooling airflow over the cylinders and cylinder heads to keep engine temperatures … Continue reading »

Categories: Firewall Forward, Hangar Completion, Turbo Aerovee Engine, Waiex #197 | Leave a comment

Hangar Completion #1 (Exhaust and Turbo Installation)

Total Build Time: 1100 Hours. Installation of my exhaust mainfold and turbocharger began with “clocking” the turbo. Basically, orienting the 3 sections of the turbo housing correctly (the turbine section, center oil section, and the compressor section.) This required some heavy duty snap ring pliers. I had to file down the tips of the pliers … Continue reading »

Categories: Firewall Forward, Hangar Completion, Turbo Aerovee Engine, Waiex #197 | Leave a comment